Projects @ HBS Infra

Highways & Bridges


Detailed Engineering (BOT / EPC / Hybrid Annuity Projects)

8-Lane expressway of Nagpur- Mumbai Super Communication Expressway (Package-1) from Km 0.000 to 31.000 in Maharastra.

Length (Kms):
31.0
Configuration (c/w):
8-Line
Mode:
EPC
Period:
2018-2019
Client:
MEIL, Hyderabad
Owner:
MSRDC
Status:
Under Progress

8-Lane expressway of Nagpur- Mumbai Super Communication Expressway (Package-9) from Km 390.445 to Km 444.845 in Maharastra.

Length (Kms):
54.4
Configuration (c/w):
8-Line
Mode:
EPC
Period:
2018-2019
Client:
MEIL, Hyderabad
Owner:
MSRDC
Status:
Under Progress

4 Laning of new link (NH-133B) from km 0.000 to km 15.885 (Junction of NH-133B and 131A on Manihari Bypass) and Construction of Manihari Bypass from km 0.000 (Junction of NH-133B and 131A on Manihari Bypass) to km 6.000 near Narenpur of NH-131A in Bihar.

Length (Kms):
21.9
Configuration (c/w):
4-Line
Mode:
Hybrid Annuity
Period:
2018-2019
Client:
SOMA
Owner:
NHAI
Status:
Under Progress

4-Lane Flyover at Amberpet - X Road, Hyderabad on NH-202 (New NH 163) in the State of Telangana.

Length (Kms):
2.5
Configuration (c/w):
4-Line
Mode:
EPC
Period:
2018-2019
Client:
BVSR Constructions
Owner:
MORTH
Status:
Under Progress

2-Lane with paved shoulder of Giddalur – Vinukonda section of NH-544D in the State of Andhra Pradesh.

Length (Kms):
113
Configuration (c/w):
2-Line
Mode:
Hybrid Annuity
Period:
2018-2019
Client:
BVSR Constructions
Owner:
NHAI
Status:
Under Progress

4 Laning of Cuttack – Angul Section of NH-42 (new NH-55) from km 0+400 to km 60+200 (Pkg-I) in Odisha .

Length (Kms):
60.0
Configuration (c/w):
4-Line
Mode:
EPC
Period:
2017-2018
Client:
Gayatri Projects Limited
Owner:
NHAI
Status:
Under Progress

Roads of trunk infrastructure in Layouts for Land Pooling Schemes in Zone-1 area in Amaravati Capital City, Andhra Pradesh.

Length (Kms):
66.8
Configuration (c/w):
Urban
Mode:
EPC
Period:
2017-2018
Client:
MEIL, Hyderabad
Owner:
CRDA / Govt. of Andhra Pradesh
Status:
Completed

Trunk infrastructure with Roads in E7, E9, E11, N3A and N3B Roads in Amaravati Capital City, Andhra Pradesh on EPC Basis. (Package – XII).

Length (Kms):
36.7
Configuration (c/w):
6-Line
Mode:
EPC
Period:
2017-2018
Client:
MEIL, Hyderabad
Owner:
ADCL / Govt. of Andhra Pradesh
Status:
Completed

Trunk infrastructure with Roads in E10 , E14 & N16 Roads in Amaravati Capital City, Andhra Pradesh on EPC Basis. (Package – VIII).

Length (Kms):
23.9
Configuration (c/w):
6-Line
Mode:
EPC
Period:
2017-2018
Client:
MEIL, Hyderabad
Owner:
ADCL / Govt. of Andhra Pradesh
Status:
Completed

2-Lane with paved shoulder of Ajanta – Buldhana section of NH-753E.

Length (Kms):
49.1
Configuration (c/w):
2-Line
Mode:
EPC
Period:
2016-2018
Client:
Sunil Hitech Engineers Limited
Owner:
MORTH
Status:
Completed

2-Lane with paved shoulder of Mehkar to Ajispur from km 00+000 (Mehkar) to km 35+836 (Ajispur) in Maharastra.

Length (Kms):
35.8
Configuration (c/w):
2-Line
Mode:
EPC
Period:
2016-2018
Client:
Sunil Hitech Engineers Limited
Owner:
MORTH
Status:
Completed

2-Lane with paved shoulder of Parli-Pimpla Dahiguda Road, From Existing Chainage Km. 0+000 To 18+495 in Maharastra.

Length (Kms):
18.5
Configuration (c/w):
2-Line
Mode:
EPC
Period:
2016-2018
Client:
Sunil Hitech Engineers Limited
Owner:
MORTH
Status:
Completed

2-Lane with paved shoulder of Mantha Taluka Border to Partur of Section – I [Design Chainage Km 0.000 to Km 51.262] in Maharastra.

Length (Kms):
51.3
Configuration (c/w):
2-Line
Mode:
EPC
Period:
2016-2018
Client:
MEIL, Hyderabad
Owner:
MORTH
Status:
Completed

2-Lane with paved shuolder of Partur to Majalgaon section from Km 51/262 to Km 101/740 (Section II) in Maharastra.

Length (Kms):
50.5
Configuration (c/w):
2-Line
Mode:
EPC
Period:
2016-20018
Client:
MEIL, Hyderabad
Owner:
MORTH
Status:
Completed

2-Lane with paved shoulder of Kaij to Kusalamb section from Km 159/258 to Km 219/986 (Section IV) in Maharastra.

Length (Kms):
60.7
Configuration (c/w):
000-Line
Mode:
EPC
Period:
2016-2018
Client:
MEIL, Hyderabad
Owner:
MORTH
Status:
Completed

2-Lane with Paved shoulder of Satara (Design km 0+000 / Existing km 1+900) to Mhaswad (Design km 85+686 / Existing km 89+200) of SH 141 in Maharastra.

Length (Kms):
85.7
Configuration (c/w):
2-Line
Mode:
EPC
Period:
2016-2018
Client:
MEIL, Hyderabad
Owner:
MORTH
Status:
Completed

2-Lane with paved shoulder of Mhaswad (Design km 85+686 / Existing km 0+000) to Tembhurni (Design km 156+164 / Existing km 70+489) in Maharastra.

Length (Kms):
57.7
Configuration (c/w):
2-Line
Mode:
EPC
Period:
2016-2018
Client:
MEIL, Hyderabad
Owner:
MORTH
Status:
Completed

2-Lane with paved shoulder / 4-Lane of (a) Karad- Tasgaon- Jath- Vijapur Road upto Karnataka border road (153 Km) (b) Nagaj Junction at NH 166 to Jath (32 Km) in the State of Maharashtra Existing Km 106 / 230 at Karad to Km 133/700 at Ghogaon & Km 29 / 000 at Ghogaon to Km 59 / 934 at Tasgaon [Design km. 0/000 at Karad to Km 58 / 830 at Tasgaon in Maharastra.

Length (Kms):
58.8
Configuration (c/w):
2-Line
Mode:
EPC
Period:
2016-2018
Client:
MEIL, Hyderabad
Owner:
MORTH
Status:
Completed

2-lane with paved shoulder from Km 444 to Km 463.545 & from Km 481 to 513.990 (Section of NH-222) in Maharastra.

Length (Kms):
56.8
Configuration (c/w):
2-Line
Mode:
EPC
Period:
2016-2018
Client:
GDCL
Owner:
MORTH
Status:
Completed

2-Lane with paved shoulder of Kolha – Nasratpur section from Km 444+000 to Km 514+000 of NH-222 in Maharashtra .

Length (Kms):
52.0
Configuration (c/w):
2-Line
Mode:
EPC
Period:
2016-2018
Client:
GDCL
Owner:
MORTH
Status:
Completed

4 Laning of Hubli - Hospet section of NH-63 from Km 128.850 to 190.280 in Karnataka.

Length (Kms):
62.0
Configuration (c/w):
4-Line
Mode:
EPC
Period:
2016-2018
Client:
KNR
Owner:
NHAI
Status:
Completed

4 Laning of Hubli - Hospet - Karnataka/AP Border(Design CH.190+280 to CH.272+571) Section in Karnataka.

Length (Kms):
82.0
Configuration (c/w):
4-Line
Mode:
EPC
Period:
2016-2018
Client:
BSCOL
Owner:
NHAI
Status:
Completed

4 Laning of Varansi - Sultanpur Section of Nh-56 in Uttar Pradesh.

Length (Kms):
138.0
Configuration (c/w):
4-Line
Mode:
EPC
Period:
2015-2017
Client:
Gayatri Projects Limited
Owner:
NHAI
Status:
Completed

Road from KM 15/0 to Km 24/660 of Visakhapatnam - Bheemunipatnam road in Andhra Pradesh.

Length (Kms):
10.0
Configuration (c/w):
4-Line
Mode:
EPC
Period:
2015-2016
Client:
Nagabhushanam & Co
Owner:
Govt of AP
Status:
Completed

2-Lane with PS of road from Umaria - Shadol section of NH-78 in Madhya Pradesh.

Length (Kms):
72.0
Configuration (c/w):
2-Line
Mode:
EPC
Period:
2015-2016
Client:
GVR Infra Projects Limited
Owner:
MPRDC
Status:
Completed

2-Lane with paved shoulder of Tanda - Raebareli section from Km 0.000 to Km 155.90 in Uttar Pradesh.

Length (Kms):
155.0
Configuration (c/w):
2-Line
Mode:
EPC
Period:
2014-2015
Client:
GKC Projects
Owner:
NHAI
Status:
Completed

4 Laning of Sidhi - Sighurauli section of Nh-75 E in Madhya Pradesh.

Length (Kms):
105.0
Configuration (c/w):
4-Line
Mode:
BOT
Period:
2013-2014
Client:
Techno Unique
Owner:
MPRDC
Status:
Completed

4 Laning of Orissa border - Aurang section from Km 163.200 to Km 239.000 in Chhattisgarh.

Length (Kms):
75.0
Configuration (c/w):
4-Line
Mode:
BOT
Period:
2012-2013
Client:
BSCPL
Owner:
NHAI
Status:
Completed

6 -laning of Varanasi - Aurangabad section of NH-2 from Km 786.000 to Km 871.000 in Uttar Pradesh.

Length (Kms):
85.0
Configuration (c/w):
6-Line
Mode:
BOT
Period:
2010-2012
Client:
SOMA
Owner:
NHAI
Status:
Completed

4 laning of Hyderabad-Karimnagar-Ramagundam road (SH-1) Km 28.200 to Km 235.058 in Andhra Pradesh.

Length (Kms):
206
Configuration (c/w):
4-Line
Mode:
BOT
Period:
2010-2011
Client:
GAYATRI / MEIL
Owner:
Govt of AP
Status:
Completed

Highways & Bridges - Government Projects - (DPR) Detailed Project Report Preparation

2-Lane with paved Shoulders from Junction of NH-67 near Ram Nagar and Terminating at its Junction with NH-66 near Sadashivgad in Karnataka (JV with TPF).

Length (Kms):
122
Configuration (c/w):
2-Line
Mode:
DPR
Period:
2017-2019
Client:
MORTH
Status:
Under Progress

6/8 Laning of km 14 to 40 of Hyderabad - Vijayawada section of NH-65 in Telengana.

Length (Kms):
26
Configuration (c/w):
6/8-Line
Mode:
DPR
Period:
2017-2019
Client:
Govt of Telangana
Status:
Under Progress

2-Lane with Paved shoulders of Shimoga - Tadasa section In karnataka (Jv with TPF).

Length (Kms):
173
Configuration (c/w):
2-Line
Mode:
DPR
Period:
2017-2019
Client:
MORTH
Status:
Under Progress

2-Lane with Paved shoulders of Tadas - Anaigiri section in Karnataka (JV with TPF).

Length (Kms):
118
Configuration (c/w):
2-Line
Mode:
DPR
Period:
2017-2019
Client:
MORTH
Status:
Under Progress

2-Lane with Paved shoulders of Afzalpur – Indi section in Karantaka.

Length (Kms):
42
Configuration (c/w):
2-Line
Mode:
DPR
Period:
2017-2018
Client:
MORTH
Status:
Under Progress

2- lane with Paved shoulders of Bodahan-Basar - Bahimsa section in Telengana.

Length (Kms):
55
Configuration (c/w):
2-Line
Mode:
DPR
Period:
2017-2018
Client:
MORTH
Status:
Under Progress

Development of Barabanki-Dewa Sharif-Fateh pur-Mahmudabad-Biswan-Laharpur-Lakhimpur. (Package NHAI/R/24), Total Length-139 Km for NH connectivity (BRT) As Associate to AECOM.

Length (Kms):
139
Configuration (c/w):
2/4-Line
Mode:
DPR
Period:
2016-2018
Client:
NHAI
Status:
Under Progress

Development of Chengalpattu near NH32-Mamallapuram (ii) Kodaighat NH-183- Kodaikanal-Palani NH-83. (Package NHAI/2T/19), Total Length-120Km for NH connectivity(BRT)" client :NHAI As Associate to AECOM.

Length (Kms):
120
Configuration (c/w):
2/4-Line
Mode:
DPR
Period:
2016-2018
Client:
NHAI
Status:
Under Progress

Development of Sahpura (NH-48) to Alwar, via Narayanpur in the State of Rajasthan As Associate to AECOM.

Length (Kms):
87
Configuration (c/w):
2/4-Line
Mode:
DPR
Period:
2016-2018
Client:
IAHE
Status:
Under Progress

2-Lane with Paved shoulders of Eturunagaram to Asifabad Cross in telengana (JV with MELTECH).

Length (Kms):
265.46
Configuration (c/w):
2-Line
Mode:
DPR
Period:
2016-2017
Client:
Govt of Telangana
Status:
Completed

Double lane works under R & B Division, Vikarabad.

Length (Kms):
80
Configuration (c/w):
2-Line
Mode:
DPR
Period:
2015-2016
Client:
Govt of Telangana
Status:
Completed

(i) 6/8 laning of Km 10-Km 20 Hyderabad - Bangalore section
(ii) Improvement of Geometrics etc. from Km 22.300 to Km 34.140 on Hyderabad - Bangalore section
(iii) Improvments of Geometrics from Km 447.00 to 464.00 of Nagapur - Hyderabad section of Nh-7 in the state of Andhra pradesh (As associate to AECOM).

Length (Kms):
40
Configuration (c/w):
6/8-Line
Mode:
DPR
Period:
2012-2014
Client:
NHAI
Status:
Completed up to FFR

Interchanges, Isolated Bridges / ROB's with Approaches - (DPR) Detailed Project Report Preparation

ROB at Kazipet at Km 133.850 parallel to the existing twon limits warangal town limits in Telengana State.

Details:
ROB with Approaches
Mode:
DPR
Period:
2017-2019
Client:
Govt of Telangana
Status:
Completed

ROB (Adjecent to Existing ROB) at Km 0/0 of ROB Link road in Warangal town limits Warangal District in Telengana Statte.

Details:
ROB with Approaches
Mode:
DPR
Period:
2017-2019
Client:
Govt of Telangana
Status:
Completed

4-Lane High level bridge at Km 3/2-4 of Vemulavada Branch Road (Mulavagu) in Karimnagar District in Telengana.

Details:
Bridges with Approaches
Mode:
DPR
Period:
2015-2016
Client:
Govt of Telangana
Status:
Completed

High level bridge on Karimnagar-Kamareddy (Old) road from Km 4/4 to 9/6 including CD works in Karimnagar District.

Details:
Bridge with Approaches
Mode:
DPR
Period:
2015-2016
Client:
Govt of Telangana
Status:
Completed

High level bridges across pyderu river & across Buckingham canal in Nellore District in Andhra Pradesh.

Details:
Bridge with Approaches
Mode:
DPR
Period:
2015-2016
Client:
Govt of Andhra Pradesh
Status:
Completed

High level bridges across Chippaleru vagu at Km 13/10 in Nellore District in Andhra Pradesh.

Details:
Bridge with Approaches
Mode:
DPR
Period:
2015-2016
Client:
Govt of Andhra Pradesh
Status:
Completed

Elevated corridor from Road no 82 Jn to Jn with Gachibowli-Rethibowli Road.

Details:
1 Km Road + Structure
Mode:
DPR
Period:
2015-2016
Client:
GHMC
Status:
Completed

ROB at Km 1/6 of Guntur - Hanumanpalem Road near Guntur.

Details:
ROB Viaduct
Mode:
DPR
Period:
2015-2016
Client:
Govt of Andhra Pradesh
Status:
Completed

Bridge with approaches across river kagna in Ranga Reddy District.

Details:
Bridge with Approaches
Mode:
DPR
Period:
2015-2016
Client:
Govt of Telangana
Status:
Completed

Bridge and with approaches across river godavari + 7 kms approach in Telengana.

Details:
Bridge with Approaches
Mode:
DPR
Period:
2015-2016
Client:
Govt of Telangana
Status:
Completed

High level Bridge across Campbell Canal at Bhavanipuram to connect Ullipalem in Krisna District of Andhra Pradesh.

Details:
Bridge with Approaches
Mode:
DPR
Period:
2013-2014
Client:
Govt of Andhra Pradesh
Status:
Completed

Bridge across Salt Creek in Km 11/4-6 of Tallepalem-Narayanapuram Road in Krishna District of Andhra Pradesh.

Details:
Bridge with Approaches
Mode:
DPR
Period:
2013-2014
Client:
Govt of Andhra Pradesh
Status:
Completed

Bridge across Buckingham Canal at km 26/3 of Rajupalem-Iskapalli road in Nellore District of Andhra Pradesh.

Details:
Bridge with Approaches
Mode:
DPR
Period:
2013-2014
Client:
Govt of Andhra Pradesh
Status:
Completed

Design Engineering of ROB/Flyover near Balacheruvu road gate with in steel plant RINL Visakhapatanam.

Details:
ROB with Approaches
Mode:
DPR
Period:
2010-2012
Client:
CPWD
Status:
Completed

Highways & Bridges - Government Projects - Feasibility Report / Preliminary Project Report (FFR/PPR)

Consultancy for Preperation of Preliminary Feasibility Study report on Outer Ring Road for KUDA region (As associate to AECOM).

Length (Kms):
44
Configuration (c/w):
4-Line
Mode:
FFR / PPR
Period:
2015-2017
Client:
KUDA, Warangal
Status:
Completed

Feasibility studies for determining the technical feasibiliy and financial viability of highways in Rajasthan (pkg-4 , 326 kms) -JV with SN BHOBHE ASSOCIATES (SN BHOBHE ASSOCIATES AS LEAD PARTNER).

Length (Kms):
326
Configuration (c/w):
2-Line
Mode:
FFR / PPR
Period:
2015-2017
Client:
Govt of Rajsthan
Status:
Completed

2-Lane with paved shulder from Nakrekal to Tanamcherla (section of NH-365) in Telengana (in JV with MC consulting).

Length (Kms):
70
Configuration (c/w):
2-Line
Mode:
FFR / PPR
Period:
2014-2015
Client:
MORTH
Status:
Completed

Interchanges, Isolated Bridges / ROB's with Approaches - Feasibility Report / Preliminary Project Report (FFR/PPR)

Flyover and Grade separator at Kalpana Square, BMC sure & Rabi Talkies Square, Bhubanneswar.

Details:
Interchangand Elevated Corridor of 2 kms
Mode:
FFR / PPR
Period:
2014-2015
Client:
GOVT of Orissa
Status:
Completed

Flyover at LB Nagar Junction & Owasi Hospittal Junction.

Details:
Multi Level Flyover
Mode:
PPR
Period:
2014-2015
Client:
GHMC
Status:
Completed

Flyover at Uppal junction in the city of Hyderabad.

Details:
Double Trumpet Interchange
Mode:
PPR
Period:
2014-2015
Client:
GHMC
Status:
Completed

Grade Separator at Chandrayangutta to the junction of Barkas Road.

Details:
Grade Separators
Mode:
PPR
Period:
2014-2015
Client:
GHMC
Status:
Completed

ROB's & their approaches in replacement of existing crossings in the State of Karnataka (7 nos).

Details:
ROB's with Approaches
Mode:
FFR / PPR
Period:
2014-2015
Client:
MORTH
Status:
Completed

Projects Locations
Project Locations