Projects @ HBS Infra

Pre-bid Engineering


Pre-bid Engineering of Highway & Bridge Projects

4-Laning of Poondiyankuppam to Sattanathapuramthe State of Tamil Nadu.

Period:
2018-2019
Client:
DRN Infrastructure

4-Laning of Ahmednagar-Mirajgaon-Karmala-Tembhurni Section of NH516A in the state of Maharashtra.

Period:
2018-2019
Client:
DRN Infrastructure

4-Laning of Ahmednagar-Mirajgaon-Karmala-Tembhurni Section of NH516A Under Package-I in the state of Maharashtra.

Length (Kms):
41.615
Client:
DRN Infrastructure

4-Laning of Dindigul to Oddanchatram section of NH-209 and Dindigul bypass in the State of Tamil Nadu.

Length (Kms):
54.33
Client:
Montecarlo Limited

4-Laning of Oddanchatram-Madathukulam section of NH-209 (New NH 83) in the State of Tamil Nadu.

Period:
2018-2019
Client:
Montecarlo Limited

4-Laning of Madathukulam-Pollachi section of NH-209 (new NH-83) with Two Spur Roads in Udulampet (7.524 km.) and improvement in Udulampet existing road ( km. 85.784 to km. 100.450) in the State of Tamil Nadu.

Period:
2018-2019
Client:
Montecarlo Limited

4-Lane divided Highway from Melur to Karaikudi in Tamil Nadu.

Period:
2018-2019
Client:
Montecarlo Limited

2/4-Laning with Paved Shoulder of Kallagam to Meensurutti section of NH-227 in the State of Tamil Naidu.

Period:
2017-2018
Client:
Montecarlo Limited

4-Laning of Saoner-Dhapewada-Kalmeshwar-Gondkhairi section of NH-547E in the State of Maharashtra.

Period:
2017-2018
Client:
Montecarlo Limited

4-Laning of Warora-Wani section of NH-930 in the state of Maharashtra.

Period:
2017-2018
Client:
Montecarlo Limited

4-Laning of Trichiraopalli to Kallagam Section of NH-227 in the State of Tamil Nadu.

Period:
2017-2018
Client:
Montecarlo Limited

2-Laning with Paved Shoulder of Meensumtti to Chidambarm Section of NH-227 in the State of Tamil Nadu.

Period:
2017-2018
Client:
Montecarlo Limited

4-Laning of NH-365A from Kodad to Khammam in the State of Telangana.

Period:
2017-2018
Client:
Montecarlo Limited

4-Laning of Suryapet to Khammam in the State of Telangana.

Period:
2017-2018
Client:
Montecarlo Limited

6-Laning of NH-140 from Chittor to Mallavaram in the State of Andhra Pradesh.

Period:
2017-2018
Client:
Montecarlo Limited

Access Controlled Nagpur-Mumbai Super Communication Expressway in the State of Maharashtra for Package 4.

Period:
2017-2018
Client:
Montecarlo Limited

Access Controlled Nagpur-Mumbai Super Communication Expressway in the State of Maharashtra for Package 8.

Period:
2017-2018
Client:
Montecarlo Limited

Access Contraolled Nagpur-Mumbai Super Communication Expressway in the State of Maharashtra for Package 11.

Period:
2017-2018
Client:
Montecarlo Limited

Prebid engineering Services for 4-Laning of Tumkur-Shivamoga section Bettadahalli-Shivamoga of NH-206 in the State of Karnataka.

Period:
2017-2018
Client:
DRN Infrastructure

4-Laning of Puducherry (Km29.000) to Poondiyankuppam (Km 67.000) Section of NH-45A (New NH-332) in the State of Tamil Nadu.

Period:
2017-2018
Client:
DRN Infrastructure

2-Laning with paved shoulder for upgradation of Salsar-Nagaur section of NH-65 in the State of Rajasthan.

Period:
2016-2017
Client:
ITNL

4/2-Laning with paved shoulder from Km 0.000 to Km 83.453 of Dusa-Lalsot-Kauthun section of NH-11A Extn in the State of Rajasthan.

Period:
2016-2017
Client:
ITNL

4-Laning of Angul-Sambalpur section of NH-42 (km 112 to Km 265).

Period:
2016-2017
Client:
SOMA

2/4-Laning of BRT Tiger Reserve Boundary to Bangalore section of NH-209 in the State of Karnataka.

Period:
2016-2017
Client:
ITNL

Improvement of Meka-Roing-Hunli from Existing Km 16 of Roing-Hunli-Road to Km 21.5 (total length = 74.863 Kms) to NH double-lane specification in Arunachal Pradesh.

Period:
2016-2017
Client:
SOMA

6-Laning of Kishangarh to Gulabpura section of NH-79 A and NH 79 in the State of Rajasthan (length 90 kms).

Period:
2016-2017
Client:
ITNL

2-lane road from Km 182.120 to Km 227.600 of NH-167 on Haggari-Jadcherla road.

Period:
2016-2017
Client:
Sunil Hightech

6-Laning of Chitradurga-devanagare-Haveri and Hubli-Haveri (3 packages).

Period:
2016-2017
Client:
ITNL

6-Laning of Anandapuram-Pendurthi-Ankapalli section of NH-5.

Period:
2016-2017
Client:
SOMA

6-Laning of Barwa adda-Aurangabad section of NH-2 (3 packages).

Period:
2016-2017
Client:
SOMA

4-Laning of Maharashtra Khamgaon-Mehkar (1 package).

Period:
2016-2017
Client:
ITNL

2-Lane with paved soulders in Maharashtra (10 package).

Period:
2016-2017
Client:
Sunil Hightech

2-Lane with paved soulders in Maharashtra (1 package).

Period:
2016-2017
Client:
Sunil Hightech

4-Laning of Hasan-Ramanathpura_prediyapatna ~ length is 73.69 Kms.

Period:
2015-2016
Client:
IL & FS

4-Laning of KM 15/0 to Km 24/660 of Visakhapatnam-Bheemunipatnam road.

Period:
2015-2016
Client:
Nagabhushanam & Co

4-Laning of Guna-Biora 7 Biora-Diwas section of NH-3 from Km 332.100 to 566.450.

Period:
2015-2016
Client:
IL & FS

4-Laning of Birmitrapur-Barkote section of NH-23.

Period:
2015-2016
Client:
HCC

4-Laning of Vijayawada-Machilipatnam section in Andhra Pradesh.

Period:
2015-2016
Client:
HCC

4-Lane ROB in Chittor-Kurnool road.

Period:
2015-2016
Client:
BEKEM

4-Laning of Haridwar-Nagina-Khashipur section.

Period:
2015-2016
Client:
HCC

4-Laning of section of NH-235 (4-Lane) Meerut-Bulandshahr section.

Period:
2015-2016
Client:
ITNL

4-Laning of Hasan to Maranapally (45 kms-4-Laning).

Period:
2015-2016
Client:
HCC

4-Laning of Adalo hole to bantwal cross (63 kms-4-Laning).

Period:
2015-2016
Client:
HCC

4-Laning of Hospet bellary section (4-Lane).

Period:
2015-2016
Client:
HCC

4-Laning of Varanasi-Gorakhpur section (4-Lane).

Period:
2015-2016
Client:
SOMA

4-Laning of Hospet-Hubli (4-Lane).

Period:
2015-2016
Client:
HCC

4-Laning of NH-6 from Km 310.806 to Km 493.300 in the State of Orissa (4-Lane).

Period:
2015-2016
Client:
ITNL

2-Laning of Hazaribagh-Barkagaon-Tandeva-Khelari-Bijupora (SH-7) in the state of Jharkhand (Structures only).

Period:
2014-2015
Client:
GKC Project Limited

4-Laning of Yadgiri-Warangal section of NH-163 (New NH-202) from Km 54.00 to Km 154.000 (Design length 99.103 Km) in the State of Telangana.

Period:
2014-2015
Client:
HCC

8-Laning of Section of NH – 1 (New NH-44) from Mukarba Chowk at KM 15.500 to Panipat at KM 86.000 on BOT (TOLL) basis in the State of Haryana.

Period:
2014-2015
Client:
ITNL

16 ROB's and 14 LHS's on l6 locations of existing railway level crossings in the state of MP.

Period:
2014-2015
Client:
ITNL

4-Laning of Hisar to Dabwali section of NH-10 from Km 170.000 to 227.000 with paved shoulder in the state of Haryana.

Period:
2014-2015
Client:
HCC

4-Laning of Hisar to Dabwali section of NH-10 from Km 227.000 to 314.660 with paved shoulder in the state of Haryana.

Period:
2014-2015
Client:
HCC

4-Laning of Shivapuri-Guna section of NH-3 from Km 236.000 to 332.1000.

Period:
2014-2015
Client:
IL & FS

4-Laning of Amritsar Tran-Taran-Harika section of NH-15.

Period:
2014-2015
Client:
HCC

4-Laning of Ghoshpukur-Falakata-Salsalabari section of NH-31 D from Km 000 (Km 551.198 of NH-31) to Km 154.854 (km 228 of NH-31C.

Period:
2013-2014
Client:
BSCPL

6-Lane ganga path from Digha to Didarganj (21.5 kms) at Patna in the state of Bihar.

Period:
2013-2014
Client:
SOMA

Elevated corridor from AIIMS to Digha at Patna.

Period:
2013-2014
Client:
SOMA

6-Laning of Jalandhar –Amritsar Section of NH-1 from Km 387.100 to Km 407.100 in the State of Punjab.

Period:
2013-2014
Client:
BSCPL

4-Laning of Solapur to Yedeshi Section of NH-211 from Km 0.000 to Km 100.000 (Design Length – 98.717 KM).

Period:
2013-2014
Client:
IL & FS

2/4-Laning of Bhagalpur by-pass.

Period:
2013-2014
Client:
Indian Progressive Const. (P) Limited

2-Lanining of Nakrekal to Nagarjuna sagar section of NH-565 from Km 1.000 to Km 86.057.

Period:
2013-2014
Client:
IL & FS

2-Laning of Hyderabad to Dindi section of NH-765 from Km 23.00 to Km 108.800.

Period:
2013-2014
Client:
IL & FS

2-Laning of NH-565 from Km 425/400 to Km 509/400 (Penchalakona to Yerpedu section).

Period:
2013-2014
Client:
IL & FS

2 Lane with paved shoulders allapuza bypass from km 408.100 to km 414.900 on NH-47.

Period:
2013-2014
Client:
SOMA

2 Lane with paved shoulders Kollam bypass from Km 486.500 to Km 499.500 on NH-47.

Period:
2013-2014
Client:
SOMA

2/4-Laning to Watur-Jintur-Aundha-Basmath & Hingoli-Aundha Road (MSH-2 & SH-249) (Total Length – 144.85 km) in the State of Maharashtra.

Period:
2013-2014
Client:
IL & FS

High-level bridge across river Godavari at km 166 of Vijayawada- Jagadalpur road of NH-221 new NH-30 in the AP.

Period:
2013-2014
Client:
BEKEM

Upgradation and Maint. Of SH3 & 33 (Managuli to Devapur) section.

Period:
2012-2013
Client:
IL & FS

4-Laning of NH-113 in the state of Assam.

Period:
2012-2013
Client:
BSCPL

2-Lane strengthening of NH-113, 11B, 148D and NH-458 in the state of Rajasthan.

Period:
2012-2013
Client:
BSCPL

2/4-Laning of Devsugu-Chikkasugur-Raichur section of SH-13.

Period:
2012-2013
Client:
IL & FS

2/4-Laning of Karaikudi-Ramanthpur section in Tamil Nadu.

Period:
2012-2013
Client:
IL & FS

Bridge across River Yamuna at Kalindi (Okhla Barrage) on line- of P-III of DMRC project.

Period:
2011-2012
Client:
Vijay Nirman Co. (P) Limited

2/4-Laning of Lucknow- Raibarely section.

Period:
2011-2012
Client:
SOMA

4-Laning of Chandikhole-Dubari-Talcher section of NH-200 & NH-23 in the state of Orissa.

Period:
2011-2012
Client:
BSCPL

4-Laning of Vikkravandi to Meensuruthi and 2-Laning of Meensuruthi to Thanjavur section of NH-45C.

Period:
2011-2012
Client:
BSCPL

4-Laning of Gomati Chauraha- Udaipur section of NH-8.

Period:
2011-2012
Client:
BSCPL

2-Laning of Raebareli – Banda section of NH-232 from Km 148.200 – 284.250 (Design ch.) in the State of Uttar Pradesh.

Period:
2011-2012
Client:
SOMA

4-Laning of Jalgaon- Gujarat/MH border section of NH-6 (km 441.950 to 650.794).

Period:
2011-2012
Client:
BSCPL

4-Laning of Solapur-Bijapur section of NH-13 from Km 0.00 to Km 110.542.

Period:
2011-2012
Client:
BSCPL

4-Laning of Jabalpur-Rewa section.

Period:
2011-2012
Client:
SOMA

4-Laning of Jabalpur-LaKhannedone section.

Period:
2011-2012
Client:
AECOM

Structures from Km 20.5 to Km 200 of NH-2 from Delhi to Agra.

Period:
2011-2012
Client:
Vijay Nirman Co. (P) Limited

4/6-Laning of Raipur- Bilaspur section of NH-200.

Period:
2011-2012
Client:
BSCPL

4-Laning of KN-MH border to Sangareddy section of NH-9.

Period:
2011-2012
Client:
BSCPL

4-Laning of Solapur- MH/KN border section of NH-9.

Period:
2011-2012
Client:
SOMA

6-Laning of Chandikhole- Paradeep section of NH-5A (km 0.00 to Km 76.618) in the State of Orissa.

Period:
2011-2012
Client:
BSCPL

4-Laning of Amaravati- Jalgaon section of NH-6.

Period:
2011-2012
Client:
SOMA

6-Laning of Barwa adda- Aurnagabad section of NH-2.

Period:
2011-2012
Client:
Soma - Indus Consortium

4/6-Laning of Goa/KN border to Kundapur section of NH-17 in the state of Karnataka.

Period:
2011-2012
Client:
AECOM

4-Laning of Beawar-Pali section of NH-14 (115 kms).

Period:
2010-2011
Client:
SOMA

4-Laning of Pali-Pindwara section of NH-14 (129 kms).

Period:
2010-2011
Client:
SOMA

4-Laning of Nagpur- Saoner-Betul section of NH-69 (km 3.00 to Km 59.300 & Km 137.00 to Km 257.4).

Period:
2010-2011
Client:
SOMA

4-Laning of Ranchi-Jamshedpur section of NH-33 (Kms 163.500).

Period:
2010-2011
Client:
SOMA

6-Laning of Hosur- Krishnagiri section of NH-7 (Km 33.13 to Km 93.00).

Period:
2010-2011
Client:
Gayatri Projects Ltd

2-Laning of Guna-Ashok Nagar-Ishagarh section of SH-20 ( Km 76.15 kms).

Period:
2010-2011
Client:
Sri Vijetha

4-Laning of Barasat- Krishnagiri section of NH-34 (Km 31.00 to Km 115.00).

Period:
2010-2011
Client:
SOMA

6-Laning of Barwa-adda-Panagarh section of NH-2 km 398.240 to Km 521.120.

Period:
2010-2011
Client:
Soma - Isolux Consortium

2-Laning of Potin to Pangin section of NH 229 in Arunachal Pradesh .

Period:
2010-2011
Client:
ECI Engg & Construction (P) Limited

4-Laning of Sikar-Reengus section of NH-11.

Period:
2010-2011
Client:
CCCL

6-Laning of NH-4 from Walajahpet to Poonamallee (Km 93.000).

Period:
2010-2011
Client:
SOMA

Projects Locations
Project Locations